The construction period of 3D artificial vertical gardens is usually affected by multiple factors such as the scale of the project, complexity, preparatory work in the early stage, and on-site conditions. The following is an analysis of the construction period:
The construction period for small-scale projects: For instance, for vertical garden projects with an area ranging from 160 to 200 square meters, if the preparatory work is thorough and the construction drawings are complete, the construction period can be controlled within 5 to 8 days. Such projects usually involve links such as foundation construction, steel structure installation, plant cultivation and irrigation system commissioning. Through efficient on-site management and multi-trade collaborative operations, rapid completion can be achieved.
The construction period for medium-sized projects: For projects with an area ranging from several hundred to several thousand square meters, the construction period may take 15 to 20 days. In addition to the foundation construction, such projects also need to consider more complex structural designs and plant configurations, and at the same time ensure the stable operation of irrigation, ventilation and other systems. The extension of the construction period mainly stems from the increased difficulty of on-site coordination and the need for optimization of technical details.
The construction period of large-scale projects: For instance, the construction period of a large vertical garden project with an area exceeding 10,000 square meters may reach three months or even longer. Such projects need to be implemented in phases, involving deep foundation pit excavation, installation of large steel structures, batch planting of plants and preparations for long-term maintenance. The construction period is significantly affected by factors such as weather, material supply, and approval processes. It is necessary to ensure the controllable progress through refined management.
Key influencing factors of the construction period:
Preparatory work: Complete construction drawings, material procurement and on-site investigation can shorten the construction period.
On-site conditions: The stability of the foundation structure and the convenience of water and electricity connection directly affect the construction efficiency.
Technical complexity: 3D stereoscopic modeling and the need for special plant cultivation may prolong the construction period.
Management efficiency: The collaborative operation of multiple trades and the quality monitoring system are crucial for project schedule control.